Atlas/Graphite America
Project 001

Graphite America

Battery-grade graphite supply: source regions, processing pathway, and siting relevant to Southern California / Imperial Valley.

Active
Overview
DomainCritical Minerals

Battery-grade graphite supply: source regions, processing pathway, and siting relevant to Southern California / Imperial Valley.

Brazil

Existing flake graphite deposits and some active production; logistics to U.S. West Coast processing are an open routing question.

Argentina

Exploration-stage interest tied to broader critical-minerals investment in the region; processing infrastructure is nascent.

North America

Domestic natural graphite production is limited; synthetic graphite capacity exists but is energy-intensive and unevenly distributed.

Mine / extraction──▶Inland transport──▶Ocean freight──▶Spheronization──▶Purification──▶Coating & finishing──▶Qualification
Current Status
Overall Completion
50%
Current: Planning
Open Risks
42
Completed Decisions
2
Evidence
109
Scenarios
3
Entities
60
StageCompletionBlocked ByNext Milestone
Planning
47%
Spheronization capacity bottleneck; Non-domestic purification concentration risk; Colorado River allocation negotiation riskEscalate Colorado River allocation negotiation
Feasibility
54%
Mozambique security and logistics exposure; Non-domestic purification concentration riskSelect primary source region for initial feedstock
Land
50%
Power
0%
Awaiting first evidence in this stage
Water
50%
Permitting
50%
Construction
53%
Spheronization single-region dependencyPrioritize processing-site permitting track
Commissioning
0%
Awaiting first evidence in this stage
Operations
48%
Scope European customer qualification
Timeline
2026-08-06Decision Drafted

Decision Drafted: Monitor Madagascar export policy

Monitor Madagascar export policy moved to Review.

by Project Lead

2026-08-04Decision Drafted

Decision Drafted: Monitor Mozambique policy developments

Monitor Mozambique policy developments moved to Review.

by Project Lead

2026-08-02Decision Approved

Decision Approved: Confirm production tax credit eligibility

Confirm production tax credit eligibility moved to Approved.

by Project Lead

2026-07-31Decision Drafted

Decision Drafted: Negotiate offtake prepayment terms

Negotiate offtake prepayment terms moved to Draft.

by Project Lead

2026-07-29Decision Drafted

Decision Drafted: Submit DOE loan guarantee application

Submit DOE loan guarantee application moved to Review.

by Project Lead

2026-07-27Decision Drafted

Decision Drafted: Lock synthetic feedstock pricing

Lock synthetic feedstock pricing moved to Review.

by Project Lead

2026-07-25Decision Drafted

Decision Drafted: Diversify process chemical supply

Diversify process chemical supply moved to Draft.

by Project Lead

2026-07-23Decision Drafted

Decision Drafted: Assess grid storage customer volume

Assess grid storage customer volume moved to Review.

by Project Lead

2026-07-21Decision Drafted

Decision Drafted: Scope European customer qualification

Scope European customer qualification moved to Draft.

by Project Lead

2026-07-19Decision Drafted

Decision Drafted: Review cross-border habitat considerations

Review cross-border habitat considerations moved to Draft.

by Project Lead

2026-07-17Decision Approved

Decision Approved: Commission emissions compliance study

Commission emissions compliance study moved to Approved.

by Project Lead

2026-07-15Decision Drafted

Decision Drafted: Scope Army Corps wetlands review

Scope Army Corps wetlands review moved to Draft.

by Project Lead

2026-07-13Decision Drafted

Decision Drafted: Track county zoning approval status

Track county zoning approval status moved to Review.

by Project Lead

2026-07-11Decision Approved

Decision Approved: Engage DTSC pre-application consultation

Engage DTSC pre-application consultation moved to Approved.

by Project Lead

2026-07-09Decision Drafted

Decision Drafted: Escalate Colorado River allocation negotiation

Escalate Colorado River allocation negotiation moved to Review.

by Project Lead

2026-07-08Evidence Accepted

Evidence Accepted: Spheronization Allocation Tightening

Candidate evidence from the Graphite Market Agent accepted and filed as EV-109, superseding EV-108.

by Research Analyst

2026-07-07Decision Drafted

Decision Drafted: Hold Parcel B as backup site

Hold Parcel B as backup site moved to Review.

by Project Lead

2026-07-05Decision Approved

Decision Approved: Confirm Parcel A as preferred site

Confirm Parcel A as preferred site moved to Approved.

by Project Lead

2026-07-03Decision Drafted

Decision Drafted: Evaluate solar array land use approval path

Evaluate solar array land use approval path moved to Review.

by Project Lead

2026-07-03Evidence Added

Evidence Imported

Follow-up review: Coating & Finishing Supplier logistics throughput has been benchmarked against comparable re

by Research Analyst

2026-07-01Decision Approved

Decision Approved: Initiate grid interconnection study

Initiate grid interconnection study moved to Approved.

by Project Lead

2026-06-30Evidence Added

Evidence Imported

Follow-up review: Cell Maker B shows measurable demand signals consistent with current offtake discussions.

by Research Analyst

2026-06-29Decision Drafted

Decision Drafted: Decline European transshipment routing

Decline European transshipment routing moved to Archived.

by Project Lead

2026-06-27Decision Drafted

Decision Drafted: Finalize feedstock warehouse siting

Finalize feedstock warehouse siting moved to Draft.

by Project Lead

2026-06-25Decision Drafted

Decision Drafted: Secure bonded warehouse capacity

Secure bonded warehouse capacity moved to Draft.

by Project Lead

2026-06-25Evidence Added

Evidence Imported

Follow-up review: Spheronization Facility (non-domestic) logistics throughput has been benchmarked against com

by Research Analyst

2026-06-23Decision Drafted

Decision Drafted: Review Vitória-Minas scheduling terms

Review Vitória-Minas scheduling terms moved to Review.

by Project Lead

2026-06-22Evidence Added

Evidence Imported

Follow-up review: Brazil Flake Deposit A shows measurable demand signals consistent with current offtake discu

by Research Analyst

2026-06-21Decision Approved

Decision Approved: Confirm Southern California rail capacity

Confirm Southern California rail capacity moved to Approved.

by Project Lead

2026-06-19Decision Drafted

Decision Drafted: Evaluate Port of Beira infrastructure upgrade

Evaluate Port of Beira infrastructure upgrade moved to Draft.

by Project Lead

2026-06-17Decision Drafted

Decision Drafted: Secure Port of Santos throughput commitment

Secure Port of Santos throughput commitment moved to Review.

by Project Lead

2026-06-17Evidence Added

Evidence Imported

Critical Minerals Production Tax Credit terms are under review as part of program capital planning.

by Research Analyst

2026-06-15Decision Drafted

Decision Drafted: Evaluate independent anode producer

Evaluate independent anode producer moved to Draft.

by Project Lead

2026-06-13Decision Drafted

Decision Drafted: Assess Cell Maker B capacity constraint

Assess Cell Maker B capacity constraint moved to Review.

by Project Lead

2026-06-12Evidence Added

Evidence Imported

Offtake Prepayment Facility terms are under review as part of program capital planning.

by Research Analyst

2026-06-11Decision Approved

Decision Approved: Extend Cell Maker A qualification timeline

Extend Cell Maker A qualification timeline moved to Approved.

by Project Lead

2026-06-09Decision Drafted

Decision Drafted: Qualify second spheronization facility

Qualify second spheronization facility moved to Review.

by Project Lead

2026-06-09Evidence Added

Evidence Imported

Petroleum Coke Supplier supply terms and lead times have been reviewed for program planning.

by Research Analyst

2026-06-07Decision Approved

Decision Approved: Pilot domestic purification line

Pilot domestic purification line moved to Approved.

by Project Lead

2026-06-05Decision Implemented

Decision Implemented: Commission independent purification audit

Commission independent purification audit moved to Implemented.

by Project Lead

2026-06-04Evidence Added

Evidence Imported

Sulfuric Acid Supplier supply terms and lead times have been reviewed for program planning.

by Research Analyst

2026-06-03Decision Drafted

Decision Drafted: Evaluate in-country Brazil processing

Evaluate in-country Brazil processing moved to Draft.

by Project Lead

2026-06-01Decision Drafted

Decision Drafted: Apply for Ontario incentive program

Apply for Ontario incentive program moved to Review.

by Project Lead

2026-06-01Evidence Added

Evidence Imported

European Battery Consortium has indicated preliminary interest in a qualification pathway.

by Research Analyst

2026-05-30Decision Drafted

Decision Drafted: Scope Gulf Coast processing site alternative

Scope Gulf Coast processing site alternative moved to Draft.

by Project Lead

2026-05-28Decision Approved

Decision Approved: Cap Brazil concentration at program ceiling

Cap Brazil concentration at program ceiling moved to Approved.

by Project Lead

2026-05-27Evidence Added

Evidence Imported

Colorado River Delta Habitat Zone environmental baseline data has been collected for permitting purposes.

by Research Analyst

2026-05-26Decision Drafted

Decision Drafted: Track Tanzania rail expansion timeline

Track Tanzania rail expansion timeline moved to Review.

by Project Lead

2026-05-24Decision Drafted

Decision Drafted: Defer Sri Lanka vein sourcing

Defer Sri Lanka vein sourcing moved to Archived.

by Project Lead

2026-05-22Decision Drafted

Decision Drafted: Evaluate Madagascar as tertiary source region

Evaluate Madagascar as tertiary source region moved to Draft.

by Project Lead

2026-05-22Evidence Added

Evidence Imported

U.S. Army Corps of Engineers (Los Angeles District) permitting timeline has been estimated based on comparable

by Research Analyst

2026-05-20Decision Drafted

Decision Drafted: Approve Mozambique sourcing feasibility study

Approve Mozambique sourcing feasibility study moved to Draft.

by Project Lead

2026-05-20Risk Opened

Risk Opened: Madagascar jurisdictional policy risk

Madagascar jurisdictional policy risk logged in the risk register.

by Risk Analyst

2026-05-19Evidence Added

Evidence Imported

Imperial County Planning & Development Services permitting timeline has been estimated based on comparable pri

by Research Analyst

2026-05-18Risk Opened

Risk Opened: Mozambique jurisdictional policy risk

Mozambique jurisdictional policy risk logged in the risk register.

by Risk Analyst

2026-05-16Risk Opened

Risk Opened: Production tax credit policy risk

Production tax credit policy risk logged in the risk register.

by Risk Analyst

2026-05-14Risk Opened

Risk Opened: Offtake prepayment structuring risk

Offtake prepayment structuring risk logged in the risk register.

by Risk Analyst

2026-05-14Evidence Added

Evidence Imported

Colorado River Aqueduct Allocation allocation pathway has been reviewed against current regional water rights.

by Research Analyst

2026-05-12Risk Opened

Risk Opened: Federal loan guarantee approval uncertainty

Federal loan guarantee approval uncertainty logged in the risk register.

by Risk Analyst

2026-05-11Evidence Added

Evidence Imported

Imperial Valley Industrial Parcel B zoning status has been confirmed as compatible with industrial processing

by Research Analyst

2026-05-10Risk Opened

Risk Opened: Synthetic feedstock cost volatility

Synthetic feedstock cost volatility logged in the risk register.

by Risk Analyst

2026-05-08Risk Opened

Risk Opened: Process chemical supplier concentration risk

Process chemical supplier concentration risk logged in the risk register.

by Risk Analyst

2026-05-06Risk Opened

Risk Opened: Grid storage customer volume uncertainty

Grid storage customer volume uncertainty logged in the risk register.

by Risk Analyst

2026-05-06Evidence Added

Evidence Imported

Imperial Valley Solar Array infrastructure assessment indicates capacity sufficient for planned initial volume

by Research Analyst

2026-05-04Risk Opened

Risk Opened: European customer qualification risk

European customer qualification risk logged in the risk register.

by Risk Analyst

2026-05-02Risk Opened

Risk Opened: Cross-border habitat review risk

Cross-border habitat review risk logged in the risk register.

by Risk Analyst

2026-05-01Evidence Added

Evidence Imported

Southern California Edison Interconnection has documented infrastructure capacity relevant to program logistic

by Research Analyst

2026-04-30Risk Opened

Risk Opened: Air basin emissions compliance risk

Air basin emissions compliance risk logged in the risk register.

by Risk Analyst

2026-04-28Risk Opened

Risk Opened: Army Corps wetlands review risk

Army Corps wetlands review risk logged in the risk register.

by Risk Analyst

2026-04-28Evidence Added

Evidence Imported

Imperial Valley Feedstock Warehouse capacity and congestion patterns have been reviewed against historical fre

by Research Analyst

2026-04-26Risk Opened

Risk Opened: County zoning approval risk

County zoning approval risk logged in the risk register.

by Risk Analyst

2026-04-24Risk Opened

Risk Opened: DTSC permitting timeline risk

DTSC permitting timeline risk logged in the risk register.

by Risk Analyst

2026-04-23Evidence Added

Evidence Imported

Long Beach Bonded Warehouse logistics throughput has been benchmarked against comparable regional facilities.

by Research Analyst

2026-04-22Risk Opened

Risk Opened: Colorado River allocation negotiation risk

Colorado River allocation negotiation risk logged in the risk register.

by Risk Analyst

2026-04-20Risk Opened

Risk Opened: Land parcel rail access risk (Parcel B)

Land parcel rail access risk (Parcel B) logged in the risk register.

by Risk Analyst

2026-04-20Evidence Added

Evidence Imported

BNSF Southern California Corridor capacity and congestion patterns have been reviewed against historical freig

by Research Analyst

2026-04-18Risk Opened

Risk Opened: Land parcel title risk (Parcel A)

Land parcel title risk (Parcel A) logged in the risk register.

by Risk Analyst

2026-04-16Risk Opened

Risk Opened: Solar array permitting risk

Solar array permitting risk logged in the risk register.

by Risk Analyst

2026-04-15Evidence Added

Evidence Imported

Port of Beira logistics throughput has been benchmarked against comparable regional facilities.

by Research Analyst

2026-04-14Risk Opened

Risk Opened: Grid interconnection timeline risk

Grid interconnection timeline risk logged in the risk register.

by Risk Analyst

2026-04-12Risk Opened

Risk Opened: European transshipment cost risk

European transshipment cost risk logged in the risk register.

by Risk Analyst

2026-04-10Risk Opened

Risk Opened: Feedstock warehouse siting risk

Feedstock warehouse siting risk logged in the risk register.

by Risk Analyst

2026-04-10Evidence Added

Evidence Imported

Independent Anode Producer has indicated preliminary interest in a qualification pathway.

by Research Analyst

2026-04-08Risk Opened

Risk Opened: Bonded warehouse capacity risk

Bonded warehouse capacity risk logged in the risk register.

by Risk Analyst

2026-04-07Evidence Added

Evidence Imported

Cell Maker B Anode Line shows measurable demand signals consistent with current offtake discussions.

by Research Analyst

2026-04-06Risk Opened

Risk Opened: Vitória-Minas Railway shared-capacity risk

Vitória-Minas Railway shared-capacity risk logged in the risk register.

by Risk Analyst

2026-04-04Risk Opened

Risk Opened: Rail corridor capacity risk (Southern California)

Rail corridor capacity risk (Southern California) logged in the risk register.

by Risk Analyst

2026-04-02Risk Opened

Risk Opened: Port of Beira infrastructure risk

Port of Beira infrastructure risk logged in the risk register.

by Risk Analyst

2026-04-02Evidence Added

Evidence Imported

Heilongjiang Spheronization Facility throughput and yield figures have been benchmarked against comparable fac

by Research Analyst

2026-03-31Risk Opened

Risk Opened: Port of Santos congestion risk

Port of Santos congestion risk logged in the risk register.

by Risk Analyst

2026-03-30Evidence Added

Evidence Imported

Ningbo Spheronization Facility process specifications meet the minimum threshold required for battery-grade ou

by Research Analyst

2026-03-29Risk Opened

Risk Opened: Independent anode producer counterparty risk

Independent anode producer counterparty risk logged in the risk register.

by Risk Analyst

2026-03-27Risk Opened

Risk Opened: Cell Maker B anode capacity constraint

Cell Maker B anode capacity constraint logged in the risk register.

by Risk Analyst

2026-03-25Risk Opened

Risk Opened: Anode line qualification timeline risk

Anode line qualification timeline risk logged in the risk register.

by Risk Analyst

2026-03-25Evidence Added

Evidence Imported

Yichang Purification Facility throughput and yield figures have been benchmarked against comparable facilities

by Research Analyst

2026-03-23Milestone Reached

Program Reaches Full Value-Chain Coverage

Every stage from raw graphite extraction through battery anode production is now represented in the entity graph.

by Atlas

2026-03-23Risk Opened

Risk Opened: Spheronization single-region dependency

Spheronization single-region dependency logged in the risk register.

by Risk Analyst

2026-03-21Risk Opened

Risk Opened: Domestic purification line unproven at scale

Domestic purification line unproven at scale logged in the risk register.

by Risk Analyst

2026-03-20Milestone Reached

Program Reaches 100-Evidence Milestone

Graphite America's evidence ledger surpasses 100 sourced, dated records.

by Atlas

2026-03-20Evidence Added

Evidence Imported

Qingdao Purification Facility process specifications meet the minimum threshold required for battery-grade out

by Research Analyst

2026-03-19Milestone Reached

Program Reaches 50-Entity Milestone

Graphite America's entity graph surpasses 50 tracked entities across the full value chain.

by Atlas

2026-03-19Risk Opened

Risk Opened: Purification capacity benchmarking uncertainty

Purification capacity benchmarking uncertainty logged in the risk register.

by Risk Analyst

2026-03-18Entity Created

Permitting Authority Recorded

California Department of Toxic Substances Control added to the entity graph.

by Research Analyst

2026-03-17Risk Opened

Risk Opened: Non-domestic purification concentration risk

Non-domestic purification concentration risk logged in the risk register.

by Risk Analyst

2026-03-17Evidence Added

Evidence Imported

Ontario Processing Site infrastructure assessment indicates capacity sufficient for planned initial volumes.

by Research Analyst

2026-03-17Entity Created

Industrial Parcel Recorded

Imperial Valley Industrial Parcel A added to the entity graph as a candidate site.

by Research Analyst

2026-03-16Entity Created

Grid Interconnection Point Recorded

Southern California Edison Interconnection added to the entity graph as a candidate site.

by Research Analyst

2026-03-15Risk Opened

Risk Opened: In-country Brazil processing capital risk

In-country Brazil processing capital risk logged in the risk register.

by Risk Analyst

2026-03-13Risk Opened

Risk Opened: Ontario site incentive uncertainty

Ontario site incentive uncertainty logged in the risk register.

by Risk Analyst

2026-03-13Entity Created

Bonded Warehouse Recorded

Long Beach Bonded Warehouse added to the entity graph.

by Research Analyst

2026-03-12Evidence Added

Evidence Imported

Louisiana Gulf Coast Processing Site has documented infrastructure capacity relevant to program logistics and

by Research Analyst

2026-03-12Entity Created

Port of Beira Recorded

Port of Beira added to the entity graph.

by Research Analyst

2026-03-11Risk Opened

Risk Opened: Gulf Coast hurricane exposure

Gulf Coast hurricane exposure logged in the risk register.

by Risk Analyst

2026-03-11Entity Created

Port of Santos Recorded

Port of Santos added to the entity graph.

by Research Analyst

2026-03-10Entity Created

Anode Line Recorded

Cell Maker A Anode Line added to the entity graph.

by Research Analyst

2026-03-09Risk Opened

Risk Opened: Single-country concentration risk (Brazil)

Single-country concentration risk (Brazil) logged in the risk register.

by Risk Analyst

2026-03-09Evidence Added

Evidence Imported

Tanzania Flake Deposit A grade and depth figures have been cross-checked against comparable regional deposits.

by Research Analyst

2026-03-09Entity Created

Domestic Purification Line Recorded

Imperial Valley Purification Line added to the entity graph as a candidate site.

by Research Analyst

2026-03-07Risk Opened

Risk Opened: Tanzania rail dependency risk

Tanzania rail dependency risk logged in the risk register.

by Risk Analyst

2026-03-06Entity Created

Non-Domestic Purification Facility Recorded

Qingdao Purification Facility added to the entity graph.

by Research Analyst

2026-03-05Risk Opened

Risk Opened: Sri Lanka vein deposit volume risk

Sri Lanka vein deposit volume risk logged in the risk register.

by Risk Analyst

2026-03-05Entity Created

Gulf Coast Site Recorded

Louisiana Gulf Coast Processing Site added to the entity graph as a candidate site.

by Research Analyst

2026-03-04Evidence Added

Evidence Imported

Sri Lanka Vein Deposit A reserve estimates are consistent with prior regional geological survey data.

by Research Analyst

2026-03-04Entity Created

Brazil Secondary Deposit Added

Brazil Flake Deposit B added to the entity graph.

by Research Analyst

2026-03-03Risk Opened

Risk Opened: Madagascar export infrastructure risk

Madagascar export infrastructure risk logged in the risk register.

by Risk Analyst

2026-03-03Entity Created

Tanzania Supplier Added

Tanzania Flake Deposit A added to the entity graph.

by Research Analyst

2026-03-02Entity Created

Sri Lanka Supplier Added

Sri Lanka Vein Deposit A added to the entity graph.

by Research Analyst

2026-03-01Risk Opened

Risk Opened: Mozambique security and logistics exposure

Mozambique security and logistics exposure logged in the risk register.

by Risk Analyst

2026-02-27Evidence Added

Evidence Imported

Mozambique Flake Deposit B grade and depth figures have been cross-checked against comparable regional deposit

by Research Analyst

2026-02-27Entity Created

Madagascar Supplier Added

Madagascar Flake Deposit A added to the entity graph.

by Research Analyst

2026-02-26Entity Created

Mozambique Supplier Added

Mozambique Flake Deposit A added to the entity graph.

by Research Analyst

2026-02-24Evidence Added

Evidence Imported

Mozambique Flake Deposit A reserve estimates are consistent with prior regional geological survey data.

by Research Analyst

2026-02-23Milestone Reached

Milestone Reached: Reference Implementation Established

Graphite America reaches a stable reference-implementation state: entity graph, evidence ledger, and scenario workspace all populated.

by Atlas

2026-02-22Report Generated

Report Generated: Project Summary

Project Summary report generated from current entity, evidence, and decision counts.

by Atlas

2026-02-22Decision Approved

Decision Approved: Environmental Review Scope

Environmental review scope approved for the candidate Imperial Valley processing site.

by Project Lead

2026-02-21Decision Drafted

Decision Drafted: Select Primary Source Region

Draft decision opened comparing Brazil and Argentina flake deposits for initial feedstock.

by Sourcing Lead

2026-02-20Decision Drafted

Decision Drafted: Prioritize Processing-Site Permitting Track

Draft decision opened on whether to begin permitting before feedstock contracts are finalized.

by Project Lead

2026-02-19Decision Implemented

Decision Implemented: Adopt Geothermal Power Offset Study

Geothermal power offset study adopted into the domestic processing scenario.

by Strategy Lead

2026-02-19Evidence Added

Evidence Imported

Regional infrastructure data on geothermal power offset imported.

by Research Analyst

2026-02-15Scenario Compared

Scenario Compared

Domestic Processing compared against Import Intermediate Product in the scenario workspace.

by Strategy Lead

2026-02-14Relationship Added

Shipping Route Recorded

Port of Long Beach recorded as the candidate inbound port for Brazil and Argentina flake shipments.

by Logistics Analyst

2026-02-11Risk Opened

Risk Opened: Spheronization Capacity Bottleneck

Limited non-domestic spheronization capacity flagged as a high-severity risk.

by Risk Analyst

2026-02-11Evidence Added

Evidence Imported

Industry reporting on concentrated non-domestic processing capacity imported.

by Research Analyst

2026-02-08Risk Opened

Risk Opened: Water Availability Constraint

Water availability flagged as a material siting constraint for the Imperial Valley candidate site.

by Risk Analyst

2026-02-07Scenario Created

Scenario Created: Joint Venture

Joint Venture scenario drafted against the entity graph.

by Strategy Lead

2026-02-06Scenario Created

Scenario Created: Import Intermediate Product

Import Intermediate Product scenario drafted against the entity graph.

by Strategy Lead

2026-02-05Evidence Added

Evidence Imported

Industry reporting on anode-material qualification cycles imported.

by Research Analyst

2026-02-05Scenario Created

Scenario Created: Domestic Processing

Domestic Processing scenario drafted against the entity graph.

by Strategy Lead

2026-01-30Evidence Added

Evidence Imported

Geological survey data on Brazil and Argentina deposits imported.

by Research Analyst

2026-01-25Entity Created

Argentina Supplier Added

Argentina Exploration Block recorded as a candidate source entity.

by Sourcing Lead

2026-01-22Evidence Added

Evidence Imported

Technical literature on synthetic graphite energy intensity imported.

by Research Analyst

2026-01-20Entity Created

Brazil Supplier Added

Brazil Flake Deposit A recorded as a candidate source entity.

by Sourcing Lead

2026-01-15Project Created

Project Created

Graphite America initialized as Atlas's first reference project.

by Sourcing Lead

Spheronization capacity bottleneck

Limited non-domestic facilities convert flake to battery-grade spherical graphite; delays here block the entire pathway.

HighOpen
Mozambique security and logistics exposure

Security conditions in northern Mozambique introduce logistics and personnel risk for Cabo Delgado sourcing.

HighOpen
Non-domestic purification concentration risk

Purification capacity remains concentrated in a small number of non-domestic facilities, mirroring the spheronization bottleneck.

HighOpen
Spheronization single-region dependency

Both primary and alternative spheronization facilities are located in the same broad region, limiting true diversification.

HighOpen
Colorado River allocation negotiation risk

Water allocation for the processing site depends on an unresolved regional negotiation among existing users.

HighOpen
Critical Decisions

Select any decision to understand how it was made.

Open decision queue →
Infrastructure
Open entity graph →
IDNameTypeStatusRegion
E-005Port of Long BeachPortExistingCalifornia, US
E-010Regional Data Center ClusterData CenterExistingSouthern California, US
E-011Imperial Irrigation District (power)Power UtilityExistingSouthern California, US
E-012Union Pacific Rail CorridorRailExistingSouthern California, US
E-016Bulk Graphite Storage TerminalStorageExistingCalifornia, US
E-017Inland Trucking Logistics ProviderTransportExistingSouthern California, US
E-035Port of SantosPortExistingSão Paulo, Brazil
E-036Port of BeiraPortExistingSofala, Mozambique
E-037BNSF Southern California CorridorRailExistingCalifornia, US
E-038Vitória-Minas RailwayRailExistingMinas Gerais / Espírito Santo, Brazil
E-039Long Beach Bonded WarehouseStorageExistingCalifornia, US
E-040Imperial Valley Feedstock WarehouseStorageCandidateCalifornia, US
E-041Rotterdam Transshipment WarehouseStorageExistingNetherlands
E-042Southern California Edison InterconnectionPower UtilityCandidateCalifornia, US
E-043Imperial Valley Solar ArrayPower UtilityCandidateCalifornia, US
E-044Imperial Valley Industrial Parcel ALand ParcelCandidateCalifornia, US
E-045Imperial Valley Industrial Parcel BLand ParcelCandidateCalifornia, US
E-046Colorado River Aqueduct AllocationWater ResourceCandidateCalifornia, US
Evidence Summary
Open evidence ledger →
Verified
55
Under review
47
Pending
7
IDNotesCategoryConfidenceStatus
EV-001Battery-grade anode graphite processing capacity is geographically concentrated outside North America.MarketHighVerified
EV-002Imperial Valley region has existing industrial power and rail infrastructure relevant to materials processing.InfrastructureMediumVerified
EV-003Brazil and Argentina have documented flake graphite deposits at varying development stages.GeologyMediumVerified
EV-004Qualification cycles for new anode material suppliers typically span multiple quarters.RegulatoryMediumUnder Review
EV-005Synthetic graphite production is energy-intensive relative to natural flake processing.TechnicalHighVerified
EV-006Port of Long Beach has existing bulk materials handling infrastructure.InfrastructureHighVerified
Domestic Processing
Active

Build a domestic processing facility against imported flake from multiple source regions.

Evidence coverage: 4 records · Resilience 5/5
Import Intermediate Product
Active

Import partially processed (spheronized) material and complete only final purification and coating domestically.

Evidence coverage: 4 records · Resilience 2/5
Joint Venture
Exploratory

Form a joint venture with a source-region producer to co-invest in processing capacity.

Evidence coverage: 1 record · Resilience 3/5
Mine (8)Processing Plant (5)Port (3)Battery Manufacturer (2)Customer (4)Data Center (1)Power Utility (3)Rail (3)Country (4)Supplier (3)Storage (4)Transport (1)Purification Facility (3)Spheronization Facility (2)Anode Production Facility (3)Land Parcel (2)Water Resource (1)Permitting Authority (3)Environmental Site (2)Financial Instrument (3)
Recent Activity
Decision Drafted: Monitor Madagascar export policy2026-08-06

Monitor Madagascar export policy moved to Review.

Decision Drafted: Monitor Mozambique policy developments2026-08-04

Monitor Mozambique policy developments moved to Review.

Decision Approved: Confirm production tax credit eligibility2026-08-02

Confirm production tax credit eligibility moved to Approved.

Decision Drafted: Negotiate offtake prepayment terms2026-07-31

Negotiate offtake prepayment terms moved to Draft.

Decision Drafted: Submit DOE loan guarantee application2026-07-29

Submit DOE loan guarantee application moved to Review.