Evidence Health
Ledger coverage and confidence
A plain accounting of what's in the ledger, what's still in review, and where the gaps are — nothing here is a judgment call, only a count.
Total Evidence
120
Accepted
120
In the ledger
Pending
12
Awaiting review
Rejected
4
Not added
Avg. Confidence
2.4 / 3
Low=1, Medium=2, High=3
Entity Coverage
81%
Entities with evidence
Most Referenced Evidence
IVE-001IID holds a Colorado River entitlement of approximately 3.1 million acre-feet annually …
4 referencesEV-001Battery-grade anode graphite processing capacity is geographically concentrated outside…
3 referencesEV-002Imperial Valley region has existing industrial power and rail infrastructure relevant t…
3 referencesEV-003Brazil and Argentina have documented flake graphite deposits at varying development sta…
3 referencesEV-008Water availability is a material siting constraint in the Imperial Valley.
3 referencesEvidence Without Links
EV-055Available bonded warehouse capacity in the immediate port-adjacent zone is limited; the…
Graphite AmericaEV-056Feedstock warehouse site selection is contingent on final processing-site layout, which…
Graphite AmericaEV-057A pre-engineered metal building of the required specification carries an estimated cons…
Graphite AmericaEV-058Rotterdam transshipment routing was quoted by two freight forwarders at an incremental …
Graphite AmericaEV-059European transshipment would only be operationally relevant if a European offtake custo…
Graphite AmericaEV-060Southern California Edison's published interconnection queue shows a current average st…
Graphite AmericaEV-061Interconnection cost estimates from SCE's publicly available fee schedule suggest $12–1…
Graphite AmericaEV-062Candidate solar array site has average annual insolation among the highest in the conti…
Graphite America+48 more not linked to any risk, scenario, or decision.
Evidence Aging
Oldest records still on file, by date filed. Age is not a quality signal by itself — some claims (e.g. geology) are stable for years.
EV-005Synthetic graphite production is energy-intensive relative to natural flake processing.
Verified167d old
EV-003Brazil and Argentina have documented flake graphite deposits at varying development sta…
Verified159d old
EV-004Qualification cycles for new anode material suppliers typically span multiple quarters.
Under Review153d old
EV-008Water availability is a material siting constraint in the Imperial Valley.
Under Review150d old
IVE-001IID holds a Colorado River entitlement of approximately 3.1 million acre-feet annually …
Verified148d old
EV-001Battery-grade anode graphite processing capacity is geographically concentrated outside…
Verified147d old
IVE-002Salton Sea geothermal field has approximately 400 MW of installed generation capacity a…
Verified146d old
EV-006Port of Long Beach has existing bulk materials handling infrastructure.