Workspace summaries
Aggregated views across projects, risks, evidence, and decisions — computed directly from the shared project model and event log.
Decision Drafted: Monitor Madagascar export policy
Monitor Madagascar export policy moved to Review.
by Project Lead
Decision Drafted: Monitor Mozambique policy developments
Monitor Mozambique policy developments moved to Review.
by Project Lead
Decision Approved: Confirm production tax credit eligibility
Confirm production tax credit eligibility moved to Approved.
by Project Lead
Decision Drafted: Negotiate offtake prepayment terms
Negotiate offtake prepayment terms moved to Draft.
by Project Lead
Decision Drafted: Submit DOE loan guarantee application
Submit DOE loan guarantee application moved to Review.
by Project Lead
Decision Drafted: Lock synthetic feedstock pricing
Lock synthetic feedstock pricing moved to Review.
by Project Lead
Decision Drafted: Diversify process chemical supply
Diversify process chemical supply moved to Draft.
by Project Lead
Decision Drafted: Assess grid storage customer volume
Assess grid storage customer volume moved to Review.
by Project Lead
Decision Drafted: Scope European customer qualification
Scope European customer qualification moved to Draft.
by Project Lead
Decision Drafted: Review cross-border habitat considerations
Review cross-border habitat considerations moved to Draft.
by Project Lead
Decision Approved: Commission emissions compliance study
Commission emissions compliance study moved to Approved.
by Project Lead
Decision Drafted: Scope Army Corps wetlands review
Scope Army Corps wetlands review moved to Draft.
by Project Lead
Decision Drafted: Track county zoning approval status
Track county zoning approval status moved to Review.
by Project Lead
Decision Approved: Engage DTSC pre-application consultation
Engage DTSC pre-application consultation moved to Approved.
by Project Lead
Decision Drafted: Escalate Colorado River allocation negotiation
Escalate Colorado River allocation negotiation moved to Review.
by Project Lead
Evidence Accepted: Spheronization Allocation Tightening
Candidate evidence from the Graphite Market Agent accepted and filed as EV-109, superseding EV-108.
by Research Analyst
Decision Drafted: Hold Parcel B as backup site
Hold Parcel B as backup site moved to Review.
by Project Lead
Decision Approved: Confirm Parcel A as preferred site
Confirm Parcel A as preferred site moved to Approved.
by Project Lead
Decision Drafted: Evaluate solar array land use approval path
Evaluate solar array land use approval path moved to Review.
by Project Lead
Evidence Imported
Follow-up review: Coating & Finishing Supplier logistics throughput has been benchmarked against comparable re
by Research Analyst
Decision Approved: Initiate grid interconnection study
Initiate grid interconnection study moved to Approved.
by Project Lead
Evidence Imported
Follow-up review: Cell Maker B shows measurable demand signals consistent with current offtake discussions.
by Research Analyst
Decision Drafted: Decline European transshipment routing
Decline European transshipment routing moved to Archived.
by Project Lead
Decision Drafted: Finalize feedstock warehouse siting
Finalize feedstock warehouse siting moved to Draft.
by Project Lead
Decision Drafted: Secure bonded warehouse capacity
Secure bonded warehouse capacity moved to Draft.
by Project Lead
Evidence Imported
Follow-up review: Spheronization Facility (non-domestic) logistics throughput has been benchmarked against com
by Research Analyst
Decision Drafted: Review Vitória-Minas scheduling terms
Review Vitória-Minas scheduling terms moved to Review.
by Project Lead
Evidence Imported
Follow-up review: Brazil Flake Deposit A shows measurable demand signals consistent with current offtake discu
by Research Analyst
Decision Approved: Confirm Southern California rail capacity
Confirm Southern California rail capacity moved to Approved.
by Project Lead
Decision Drafted: Evaluate Port of Beira infrastructure upgrade
Evaluate Port of Beira infrastructure upgrade moved to Draft.
by Project Lead
Decision Drafted: Secure Port of Santos throughput commitment
Secure Port of Santos throughput commitment moved to Review.
by Project Lead
Evidence Imported
Critical Minerals Production Tax Credit terms are under review as part of program capital planning.
by Research Analyst
Decision Drafted: Evaluate independent anode producer
Evaluate independent anode producer moved to Draft.
by Project Lead
Decision Drafted: Assess Cell Maker B capacity constraint
Assess Cell Maker B capacity constraint moved to Review.
by Project Lead
Evidence Imported
Offtake Prepayment Facility terms are under review as part of program capital planning.
by Research Analyst
Decision Approved: Extend Cell Maker A qualification timeline
Extend Cell Maker A qualification timeline moved to Approved.
by Project Lead
Decision Drafted: Qualify second spheronization facility
Qualify second spheronization facility moved to Review.
by Project Lead
Evidence Imported
Petroleum Coke Supplier supply terms and lead times have been reviewed for program planning.
by Research Analyst
Decision Approved: Pilot domestic purification line
Pilot domestic purification line moved to Approved.
by Project Lead
Decision Implemented: Commission independent purification audit
Commission independent purification audit moved to Implemented.
by Project Lead
Evidence Imported
Sulfuric Acid Supplier supply terms and lead times have been reviewed for program planning.
by Research Analyst
Decision Drafted: Evaluate in-country Brazil processing
Evaluate in-country Brazil processing moved to Draft.
by Project Lead
Decision Drafted: Apply for Ontario incentive program
Apply for Ontario incentive program moved to Review.
by Project Lead
Evidence Imported
European Battery Consortium has indicated preliminary interest in a qualification pathway.
by Research Analyst
Decision Drafted: Scope Gulf Coast processing site alternative
Scope Gulf Coast processing site alternative moved to Draft.
by Project Lead
Decision Approved: Cap Brazil concentration at program ceiling
Cap Brazil concentration at program ceiling moved to Approved.
by Project Lead
Evidence Imported
Colorado River Delta Habitat Zone environmental baseline data has been collected for permitting purposes.
by Research Analyst
Decision Drafted: Track Tanzania rail expansion timeline
Track Tanzania rail expansion timeline moved to Review.
by Project Lead
Decision Drafted: Defer Sri Lanka vein sourcing
Defer Sri Lanka vein sourcing moved to Archived.
by Project Lead
Decision Drafted: Evaluate Madagascar as tertiary source region
Evaluate Madagascar as tertiary source region moved to Draft.
by Project Lead
Evidence Imported
U.S. Army Corps of Engineers (Los Angeles District) permitting timeline has been estimated based on comparable
by Research Analyst
Decision Drafted: Approve Mozambique sourcing feasibility study
Approve Mozambique sourcing feasibility study moved to Draft.
by Project Lead
Risk Opened: Madagascar jurisdictional policy risk
Madagascar jurisdictional policy risk logged in the risk register.
by Risk Analyst
Evidence Imported
Imperial County Planning & Development Services permitting timeline has been estimated based on comparable pri
by Research Analyst
Risk Opened: Mozambique jurisdictional policy risk
Mozambique jurisdictional policy risk logged in the risk register.
by Risk Analyst
Risk Opened: Production tax credit policy risk
Production tax credit policy risk logged in the risk register.
by Risk Analyst
Risk Opened: Offtake prepayment structuring risk
Offtake prepayment structuring risk logged in the risk register.
by Risk Analyst
Evidence Imported
Colorado River Aqueduct Allocation allocation pathway has been reviewed against current regional water rights.
by Research Analyst
Risk Opened: Federal loan guarantee approval uncertainty
Federal loan guarantee approval uncertainty logged in the risk register.
by Risk Analyst
Evidence Imported
Imperial Valley Industrial Parcel B zoning status has been confirmed as compatible with industrial processing
by Research Analyst
Risk Opened: Synthetic feedstock cost volatility
Synthetic feedstock cost volatility logged in the risk register.
by Risk Analyst
Risk Opened: Process chemical supplier concentration risk
Process chemical supplier concentration risk logged in the risk register.
by Risk Analyst
Risk Opened: Grid storage customer volume uncertainty
Grid storage customer volume uncertainty logged in the risk register.
by Risk Analyst
Evidence Imported
Imperial Valley Solar Array infrastructure assessment indicates capacity sufficient for planned initial volume
by Research Analyst
Risk Opened: European customer qualification risk
European customer qualification risk logged in the risk register.
by Risk Analyst
Risk Opened: Cross-border habitat review risk
Cross-border habitat review risk logged in the risk register.
by Risk Analyst
Evidence Imported
Southern California Edison Interconnection has documented infrastructure capacity relevant to program logistic
by Research Analyst
Risk Opened: Air basin emissions compliance risk
Air basin emissions compliance risk logged in the risk register.
by Risk Analyst
Risk Opened: Army Corps wetlands review risk
Army Corps wetlands review risk logged in the risk register.
by Risk Analyst
Evidence Imported
Imperial Valley Feedstock Warehouse capacity and congestion patterns have been reviewed against historical fre
by Research Analyst
Risk Opened: County zoning approval risk
County zoning approval risk logged in the risk register.
by Risk Analyst
Risk Opened: DTSC permitting timeline risk
DTSC permitting timeline risk logged in the risk register.
by Risk Analyst
Evidence Imported
Long Beach Bonded Warehouse logistics throughput has been benchmarked against comparable regional facilities.
by Research Analyst
Risk Opened: Colorado River allocation negotiation risk
Colorado River allocation negotiation risk logged in the risk register.
by Risk Analyst
Risk Opened: Land parcel rail access risk (Parcel B)
Land parcel rail access risk (Parcel B) logged in the risk register.
by Risk Analyst
Evidence Imported
BNSF Southern California Corridor capacity and congestion patterns have been reviewed against historical freig
by Research Analyst
Risk Opened: Land parcel title risk (Parcel A)
Land parcel title risk (Parcel A) logged in the risk register.
by Risk Analyst
Risk Opened: Solar array permitting risk
Solar array permitting risk logged in the risk register.
by Risk Analyst
Evidence Imported
Port of Beira logistics throughput has been benchmarked against comparable regional facilities.
by Research Analyst
Risk Opened: Grid interconnection timeline risk
Grid interconnection timeline risk logged in the risk register.
by Risk Analyst
Risk Opened: European transshipment cost risk
European transshipment cost risk logged in the risk register.
by Risk Analyst
Risk Opened: Feedstock warehouse siting risk
Feedstock warehouse siting risk logged in the risk register.
by Risk Analyst
Evidence Imported
Independent Anode Producer has indicated preliminary interest in a qualification pathway.
by Research Analyst
Risk Opened: Bonded warehouse capacity risk
Bonded warehouse capacity risk logged in the risk register.
by Risk Analyst
Evidence Imported
Cell Maker B Anode Line shows measurable demand signals consistent with current offtake discussions.
by Research Analyst
Risk Opened: Vitória-Minas Railway shared-capacity risk
Vitória-Minas Railway shared-capacity risk logged in the risk register.
by Risk Analyst
Risk Opened: Rail corridor capacity risk (Southern California)
Rail corridor capacity risk (Southern California) logged in the risk register.
by Risk Analyst
Risk Opened: Port of Beira infrastructure risk
Port of Beira infrastructure risk logged in the risk register.
by Risk Analyst
Evidence Imported
Heilongjiang Spheronization Facility throughput and yield figures have been benchmarked against comparable fac
by Research Analyst
Risk Opened: Port of Santos congestion risk
Port of Santos congestion risk logged in the risk register.
by Risk Analyst
Evidence Imported
Ningbo Spheronization Facility process specifications meet the minimum threshold required for battery-grade ou
by Research Analyst
Risk Opened: Independent anode producer counterparty risk
Independent anode producer counterparty risk logged in the risk register.
by Risk Analyst
Risk Opened: Cell Maker B anode capacity constraint
Cell Maker B anode capacity constraint logged in the risk register.
by Risk Analyst
Risk Opened: Anode line qualification timeline risk
Anode line qualification timeline risk logged in the risk register.
by Risk Analyst
Evidence Imported
Yichang Purification Facility throughput and yield figures have been benchmarked against comparable facilities
by Research Analyst
Program Reaches Full Value-Chain Coverage
Every stage from raw graphite extraction through battery anode production is now represented in the entity graph.
by Atlas
Risk Opened: Spheronization single-region dependency
Spheronization single-region dependency logged in the risk register.
by Risk Analyst
Risk Opened: Domestic purification line unproven at scale
Domestic purification line unproven at scale logged in the risk register.
by Risk Analyst
Program Reaches 100-Evidence Milestone
Graphite America's evidence ledger surpasses 100 sourced, dated records.
by Atlas
Evidence Imported
Qingdao Purification Facility process specifications meet the minimum threshold required for battery-grade out
by Research Analyst
Program Reaches 50-Entity Milestone
Graphite America's entity graph surpasses 50 tracked entities across the full value chain.
by Atlas
Risk Opened: Purification capacity benchmarking uncertainty
Purification capacity benchmarking uncertainty logged in the risk register.
by Risk Analyst
Permitting Authority Recorded
California Department of Toxic Substances Control added to the entity graph.
by Research Analyst
Risk Opened: Non-domestic purification concentration risk
Non-domestic purification concentration risk logged in the risk register.
by Risk Analyst
Evidence Imported
Ontario Processing Site infrastructure assessment indicates capacity sufficient for planned initial volumes.
by Research Analyst
Industrial Parcel Recorded
Imperial Valley Industrial Parcel A added to the entity graph as a candidate site.
by Research Analyst
Grid Interconnection Point Recorded
Southern California Edison Interconnection added to the entity graph as a candidate site.
by Research Analyst
Risk Opened: In-country Brazil processing capital risk
In-country Brazil processing capital risk logged in the risk register.
by Risk Analyst
Risk Opened: Ontario site incentive uncertainty
Ontario site incentive uncertainty logged in the risk register.
by Risk Analyst
Bonded Warehouse Recorded
Long Beach Bonded Warehouse added to the entity graph.
by Research Analyst
Evidence Imported
Louisiana Gulf Coast Processing Site has documented infrastructure capacity relevant to program logistics and
by Research Analyst
Port of Beira Recorded
Port of Beira added to the entity graph.
by Research Analyst
Risk Opened: Gulf Coast hurricane exposure
Gulf Coast hurricane exposure logged in the risk register.
by Risk Analyst
Port of Santos Recorded
Port of Santos added to the entity graph.
by Research Analyst
Anode Line Recorded
Cell Maker A Anode Line added to the entity graph.
by Research Analyst
Risk Opened: Single-country concentration risk (Brazil)
Single-country concentration risk (Brazil) logged in the risk register.
by Risk Analyst
Evidence Imported
Tanzania Flake Deposit A grade and depth figures have been cross-checked against comparable regional deposits.
by Research Analyst
Domestic Purification Line Recorded
Imperial Valley Purification Line added to the entity graph as a candidate site.
by Research Analyst
Risk Opened: Tanzania rail dependency risk
Tanzania rail dependency risk logged in the risk register.
by Risk Analyst
Non-Domestic Purification Facility Recorded
Qingdao Purification Facility added to the entity graph.
by Research Analyst
Risk Opened: Sri Lanka vein deposit volume risk
Sri Lanka vein deposit volume risk logged in the risk register.
by Risk Analyst
Gulf Coast Site Recorded
Louisiana Gulf Coast Processing Site added to the entity graph as a candidate site.
by Research Analyst
Evidence Imported
Sri Lanka Vein Deposit A reserve estimates are consistent with prior regional geological survey data.
by Research Analyst
Brazil Secondary Deposit Added
Brazil Flake Deposit B added to the entity graph.
by Research Analyst
Risk Opened: Madagascar export infrastructure risk
Madagascar export infrastructure risk logged in the risk register.
by Risk Analyst
Tanzania Supplier Added
Tanzania Flake Deposit A added to the entity graph.
by Research Analyst
Sri Lanka Supplier Added
Sri Lanka Vein Deposit A added to the entity graph.
by Research Analyst
Risk Opened: Mozambique security and logistics exposure
Mozambique security and logistics exposure logged in the risk register.
by Risk Analyst
Evidence Imported
Mozambique Flake Deposit B grade and depth figures have been cross-checked against comparable regional deposit
by Research Analyst
Madagascar Supplier Added
Madagascar Flake Deposit A added to the entity graph.
by Research Analyst
Milestone Reached: Systems Model Established
Imperial Valley Corridor reaches a stable systems-model state: chokepoints and cascading effects are explicitly represented in the entity graph, not just individual sites.
by Atlas
Risk Opened: Semiconductor Siting Double-Constraint
Semiconductor siting flagged as constrained by both water and transmission simultaneously — resolving one alone would not unblock it.
by Risk Analyst
Semiconductor Fabrication Site Recorded
Semiconductor Fabrication Site added to the entity graph as a candidate site as a new downstream demand node.
by Regional Strategy Lead
Mozambique Supplier Added
Mozambique Flake Deposit A added to the entity graph.
by Research Analyst
Risk Opened: Cascading Water-to-Industrial Reallocation Effect
Cascading effect between agricultural reallocation, the water district's process, and cross-border flow conditions formally logged as a single risk.
by Risk Analyst
Cross-Border Water Flow Linked
New River cross-border flow linked to both agricultural and Colorado River allocation entities, formalizing the cascading water effect.
by Regional Strategy Lead
Decision Drafted: Scope Transmission Backbone Upgrade Study
Draft decision opened to scope a transmission upgrade study before further siting commitments.
by Regional Strategy Lead
Risk Opened: Transmission Backbone Chokepoint
Transmission capacity flagged as a high-severity chokepoint constraining three downstream candidate sites simultaneously.
by Risk Analyst
Evidence Imported
Regional infrastructure data confirming transmission capacity as the binding constraint imported.
by Research Analyst
Transmission Backbone Recorded
IID Transmission Backbone recorded as a distinct entity after evidence showed it, not generation, is the binding power constraint.
by Regional Strategy Lead
Evidence Imported
Mozambique Flake Deposit A reserve estimates are consistent with prior regional geological survey data.
by Research Analyst
Report Generated: Project Summary
Project Summary report generated from current entity, evidence, and decision counts.
by Atlas
Scenario Compared
Co-located Lithium and Power compared against Water-Constrained Siting in the scenario workspace.
by Regional Strategy Lead
Decision Approved: Preliminary Land Parcel Survey
Preliminary survey of undeveloped industrial parcels approved to support future siting scenarios.
by Regional Strategy Lead
Milestone Reached: Reference Implementation Established
Graphite America reaches a stable reference-implementation state: entity graph, evidence ledger, and scenario workspace all populated.
by Atlas
Decision Drafted: Water Allocation Pathway
Draft decision opened on whether new industrial water demand requires reallocation or a new supply source.
by Regional Strategy Lead
Report Generated: Project Summary
Project Summary report generated from current entity, evidence, and decision counts.
by Atlas
Decision Approved: Environmental Review Scope
Environmental review scope approved for the candidate Imperial Valley processing site.
by Project Lead
Decision Drafted: Scope Lithium Extraction Pilot
Draft decision opened to scope a pilot program for commercial-scale lithium extraction.
by Critical Minerals Lead
Evidence Imported
Rail authority data on existing freight capacity imported.
by Research Analyst
Decision Drafted: Select Primary Source Region
Draft decision opened comparing Brazil and Argentina flake deposits for initial feedstock.
by Sourcing Lead
Evidence Imported
County zoning data on undeveloped industrial parcels imported.
by Research Analyst
Scenario Created: Water-Constrained Siting
Water-Constrained Siting scenario drafted, treating water allocation as the primary constraint.
by Regional Strategy Lead
Decision Drafted: Prioritize Processing-Site Permitting Track
Draft decision opened on whether to begin permitting before feedstock contracts are finalized.
by Project Lead
Evidence Imported
Preliminary data center siting interest recorded, tied to regional geothermal power availability.
by Research Analyst
Decision Implemented: Adopt Geothermal Power Offset Study
Geothermal power offset study adopted into the domestic processing scenario.
by Strategy Lead
Evidence Imported
Regional infrastructure data on geothermal power offset imported.
by Research Analyst
Scenario Created: Cross-Border Manufacturing Integration
Cross-Border Manufacturing Integration scenario drafted against the entity graph.
by Regional Strategy Lead
Evidence Imported
Border crossing data on existing commercial freight capacity imported.
by Research Analyst
Cross-Border Logistics Linked
Calexico border crossing linked to the Mexicali industrial corridor in the entity graph.
by Logistics Analyst
Scenario Created: Co-located Lithium and Power
Co-located Lithium and Power scenario drafted against the entity graph.
by Critical Minerals Lead
Scenario Compared
Domestic Processing compared against Import Intermediate Product in the scenario workspace.
by Strategy Lead
Project Created
Semiconductor Supply Chain placeholder project initialized for future scoping.
by Atlas
Evidence Imported
Industry reporting on direct lithium extraction technology imported.
by Research Analyst
Industrial Site Recorded
Lithium Valley Extraction Site recorded as a candidate direct lithium extraction location.
by Critical Minerals Lead
Shipping Route Recorded
Port of Long Beach recorded as the candidate inbound port for Brazil and Argentina flake shipments.
by Logistics Analyst
Project Created
AI Infrastructure placeholder project initialized for future scoping.
by Atlas
Evidence Imported
Regional infrastructure data confirming co-located geothermal and lithium-bearing brine potential imported.
by Research Analyst
Risk Opened: Spheronization Capacity Bottleneck
Limited non-domestic spheronization capacity flagged as a high-severity risk.
by Risk Analyst
Evidence Imported
Industry reporting on concentrated non-domestic processing capacity imported.
by Research Analyst
Project Created
Battery Materials placeholder project initialized for future scoping.
by Atlas
Risk Opened: Water Allocation Constraint
Water allocation flagged as a high-severity, binding constraint on all industrial siting decisions.
by Risk Analyst
Evidence Imported
Regional water authority data on Colorado River allocation imported.
by Research Analyst
Risk Opened: Water Availability Constraint
Water availability flagged as a material siting constraint for the Imperial Valley candidate site.
by Risk Analyst
Scenario Created: Joint Venture
Joint Venture scenario drafted against the entity graph.
by Strategy Lead
Water Infrastructure Updated
Colorado River allocation to Imperial Irrigation District recorded as the region's binding water resource.
by Regional Strategy Lead
Scenario Created: Import Intermediate Product
Import Intermediate Product scenario drafted against the entity graph.
by Strategy Lead
Geothermal Plant Added
Salton Sea Geothermal Field recorded as an existing regional power source.
by Regional Strategy Lead
Evidence Imported
Industry reporting on anode-material qualification cycles imported.
by Research Analyst
Scenario Created: Domestic Processing
Domestic Processing scenario drafted against the entity graph.
by Strategy Lead
Project Created
Imperial Valley Corridor initialized as Atlas's first regional systems project.
by Regional Strategy Lead
Evidence Imported
Geological survey data on Brazil and Argentina deposits imported.
by Research Analyst
Argentina Supplier Added
Argentina Exploration Block recorded as a candidate source entity.
by Sourcing Lead
Evidence Imported
Technical literature on synthetic graphite energy intensity imported.
by Research Analyst
Brazil Supplier Added
Brazil Flake Deposit A recorded as a candidate source entity.
by Sourcing Lead
Project Created
Graphite America initialized as Atlas's first reference project.
by Sourcing Lead