Entity · E-042
Southern California Edison Interconnection
Candidate grid interconnection point for processing-site power supply.
Power UtilityCandidate
Summary
Evidence
Open evidence ledger →| ID | Date | Category | Source | Confidence | Status | Notes |
|---|---|---|---|---|---|---|
| EV-060 | 2026-05-01 | Infrastructure | Regional infrastructure data | High | Verified | Southern California Edison's published interconnection queue shows a current average study-to-energization timeline of approximately 3.5 years for comparable industrial loads in the region. |
| EV-061 | 2026-05-04 | Infrastructure | Regional infrastructure data | High | Under Review | Interconnection cost estimates from SCE's publicly available fee schedule suggest $12–18 million in network upgrade costs could be allocated to this project depending on final queue position. |
Relationships
Imperial Irrigation District (power)──▶Interconnects with──▶Southern California Edison Interconnection
| From | Relation | To |
|---|---|---|
| Southern California Edison Interconnection | Powers | Imperial Valley Processing Site |
| Imperial Valley Solar Array | Supplements | Southern California Edison Interconnection |
| Imperial Irrigation District (power) | Interconnects with | Southern California Edison Interconnection |
Risks
Open risk register →No risks linked to this entity yet.
Scenarios
Open scenario workspace →This entity is not a dependency of any scenario yet.
Open Decisions
Open decision queue →No open decisions reference this entity.
Timeline
2026-05-01Evidence Added
Evidence Imported
Southern California Edison Interconnection has documented infrastructure capacity relevant to program logistic
by Research Analyst
2026-03-16Entity Created
Grid Interconnection Point Recorded
Southern California Edison Interconnection added to the entity graph as a candidate site.
by Research Analyst