Project 001 · Understand How This Decision Was Made

Select primary source region for initial feedstock

Compare Brazil and Argentina flake deposits against logistics cost and qualification timeline before committing initial offtake volume.

Review
Everything below reflects exactly what was known as of 2026-02-21 — the evidence available, the risks on record, and the reasoning that followed. Nothing here has been revised with hindsight.
Decision Rationale
High

No rationale recorded for this decision.

Supporting Evidence Cited
IDDateCategoryConfidenceNotes
EV-0032026-01-30GeologyMediumBrazil and Argentina have documented flake graphite deposits at varying development stages.
Evidence Available Then
10 records existed as of 2026-02-21
IDDateCategoryNotes
EV-0102026-02-21InfrastructureBulk storage terminal capacity appears sufficient for initial import volumes.
EV-0072026-02-20MarketTwo candidate cell makers have publicly stated anode-material diversification interest.
EV-0092026-02-19InfrastructureExisting geothermal power generation in the Imperial Valley could offset processing energy load.
EV-0022026-02-18InfrastructureImperial Valley region has existing industrial power and rail infrastructure relevant to materials processing.
EV-0062026-02-14InfrastructurePort of Long Beach has existing bulk materials handling infrastructure.
EV-0012026-02-11MarketBattery-grade anode graphite processing capacity is geographically concentrated outside North America.
EV-0082026-02-08InfrastructureWater availability is a material siting constraint in the Imperial Valley.
EV-0042026-02-05RegulatoryQualification cycles for new anode material suppliers typically span multiple quarters.
EV-0032026-01-30GeologyBrazil and Argentina have documented flake graphite deposits at varying development stages.
EV-0052026-01-22TechnicalSynthetic graphite production is energy-intensive relative to natural flake processing.
Risks Known Then
3 risks logged as of 2026-02-21
Qualification cycle length

Cell makers require long qualification lead times before switching anode suppliers, extending time to revenue.

MediumOpen
Spheronization capacity bottleneck

Limited non-domestic facilities convert flake to battery-grade spherical graphite; delays here block the entire pathway.

HighOpen
Water availability constraint

Processing facility siting in the Imperial Valley is sensitive to regional water allocation limits.

MediumMonitoring
Unknown Factors

No unknown factors recorded for this decision.

Outcome

Outcome not yet recorded — this decision may still be open.

Lessons Learned

No lessons learned recorded for this decision.