EV-031 · v1 · Graphite America
Facility has operated continuously since 2016 with no publicly reported major outages, …
Facility has operated continuously since 2016 with no publicly reported major outages, suggesting mature process control relative to newer entrants.
Verified
Original Observation
No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.
Extracted Claim
Facility has operated continuously since 2016 with no publicly reported major outages, suggesting mature process control relative to newer entrants.
Supporting Sources
Technical literature
technicalprocessing
Confidence
MediumReviewed by Research Analyst · Accepted 2026-03-23
Linked Entities
Linked Risks
No probabilistic risks linked.
Linked Constraints
Rail corridor capacity risk (Southern California)Low
Affected Scenarios
No scenarios reference this evidence.
Affected Decisions
Related Evidence
| ID | Notes | Confidence |
|---|---|---|
| EV-030 | Qingdao facility throughput is independently estimated at 40,000–50,000 tonnes of spherical graphite annually based on trade data and satellite imagery of stockpile volumes. | Medium |
Timeline
No logged events reference this record directly yet.
Replay References