EV-020 · v1 · Graphite America
Resource drilling is approximately 60% complete; current indicated resource of 9 millio…
Resource drilling is approximately 60% complete; current indicated resource of 9 million tonnes at 7.1% Cg is expected to grow as the 2026 drill program concludes.
Verified
Original Observation
No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.
Extracted Claim
Resource drilling is approximately 60% complete; current indicated resource of 9 million tonnes at 7.1% Cg is expected to grow as the 2026 drill program concludes.
Supporting Sources
Geological survey data
geologysourcing
Confidence
HighReviewed by Research Analyst · Accepted 2026-03-06
Linked Entities
Linked Risks
In-country Brazil processing capital riskMedium
Linked Constraints
No structural constraints linked.
Affected Scenarios
No scenarios reference this evidence.
Affected Decisions
Related Evidence
| ID | Notes | Confidence |
|---|---|---|
| EV-021 | Deposit sits within 40 km of the planned Mtwara–Songea rail extension, which would materially change export logistics if completed on the currently published timeline. | High |