EV-020 · v1 · Graphite America

Resource drilling is approximately 60% complete; current indicated resource of 9 millio…

Resource drilling is approximately 60% complete; current indicated resource of 9 million tonnes at 7.1% Cg is expected to grow as the 2026 drill program concludes.

Verified
Original Observation

No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.

Extracted Claim

Resource drilling is approximately 60% complete; current indicated resource of 9 million tonnes at 7.1% Cg is expected to grow as the 2026 drill program concludes.

Supporting Sources
Geological survey data
geologysourcing
Confidence
HighReviewed by Research Analyst · Accepted 2026-03-06
Linked Entities
Linked Risks
In-country Brazil processing capital riskMedium
Linked Constraints

No structural constraints linked.

Affected Scenarios

No scenarios reference this evidence.

Affected Decisions
Related Evidence
IDNotesConfidence
EV-021Deposit sits within 40 km of the planned Mtwara–Songea rail extension, which would materially change export logistics if completed on the currently published timeline.High