Entity · E-022
Tanzania Flake Deposit A
Flake graphite deposit adjacent to planned rail expansion.
MineExisting
Summary
Evidence
Open evidence ledger →| ID | Date | Category | Source | Confidence | Status | Notes |
|---|---|---|---|---|---|---|
| EV-020 | 2026-03-06 | Geology | Geological survey data | High | Verified | Resource drilling is approximately 60% complete; current indicated resource of 9 million tonnes at 7.1% Cg is expected to grow as the 2026 drill program concludes. |
| EV-021 | 2026-03-09 | Geology | Geological survey data | High | Under Review | Deposit sits within 40 km of the planned Mtwara–Songea rail extension, which would materially change export logistics if completed on the currently published timeline. |
Relationships
| From | Relation | To |
|---|---|---|
| Tanzania Flake Deposit A | Ships to | Port of Beira |
Risks
Open risk register →In-country Brazil processing capital risk
An in-country Brazilian processing site would require capital deployment in a jurisdiction with currency volatility.
MediumOpen
Non-domestic purification concentration risk
Purification capacity remains concentrated in a small number of non-domestic facilities, mirroring the spheronization bottleneck.
HighOpen
Scenarios
Open scenario workspace →This entity is not a dependency of any scenario yet.
Open Decisions
Open decision queue →Evaluate in-country Brazil processing
Assess capital and currency implications of processing closer to the Brazilian source deposits.
MediumDraft
Timeline
2026-03-09Evidence Added
Evidence Imported
Tanzania Flake Deposit A grade and depth figures have been cross-checked against comparable regional deposits.
by Research Analyst
2026-03-03Entity Created
Tanzania Supplier Added
Tanzania Flake Deposit A added to the entity graph.
by Research Analyst