Imperial Irrigation District's infrastructure assessment confirms existing substation capacity is sufficient for the initial processing-site load, though full build-out would likely require the separate SCE interconnection under evaluation.

Verified
Original Observation

No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.

Extracted Claim

Imperial Irrigation District's infrastructure assessment confirms existing substation capacity is sufficient for the initial processing-site load, though full build-out would likely require the separate SCE interconnection under evaluation.

Supporting Sources
Regional infrastructure data
infrastructuresiting
Confidence
LowReviewed by Project Lead · Accepted 2026-07-01
Linked Entities
Linked Risks

No probabilistic risks linked.

Linked Constraints

No structural constraints linked.

Affected Scenarios

No scenarios reference this evidence.

Affected Decisions

No decisions cite this evidence.

Related Evidence
IDNotesConfidence
EV-009Existing geothermal power generation in the Imperial Valley could offset processing energy load.Medium