Imperial Irrigation District's infrastructure assessment confirms existing substation c…
Imperial Irrigation District's infrastructure assessment confirms existing substation capacity is sufficient for the initial processing-site load, though full build-out would likely require the separate SCE interconnection under evaluation.
No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.
Imperial Irrigation District's infrastructure assessment confirms existing substation capacity is sufficient for the initial processing-site load, though full build-out would likely require the separate SCE interconnection under evaluation.
No probabilistic risks linked.
No structural constraints linked.
No scenarios reference this evidence.
No decisions cite this evidence.
| ID | Notes | Confidence |
|---|---|---|
| EV-009 | Existing geothermal power generation in the Imperial Valley could offset processing energy load. | Medium |
No logged events reference this record directly yet.
This evidence is not cited in any decision replay yet.