EV-075 · v1 · Graphite America

A preliminary wetlands delineation survey commissioned for this program identified no j…

A preliminary wetlands delineation survey commissioned for this program identified no jurisdictional wetlands within the primary site boundary, though the adjacent water infrastructure corridor remains under review.

Verified
Original Observation

No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.

Extracted Claim

A preliminary wetlands delineation survey commissioned for this program identified no jurisdictional wetlands within the primary site boundary, though the adjacent water infrastructure corridor remains under review.

Supporting Sources
Permitting authority data
permittingregulatory
Confidence
MediumReviewed by Permitting Lead · Accepted 2026-05-22
Linked Entities
Linked Risks

No probabilistic risks linked.

Linked Constraints

No structural constraints linked.

Affected Scenarios

No scenarios reference this evidence.

Affected Decisions

No decisions cite this evidence.

Related Evidence
IDNotesConfidence
EV-074Army Corps jurisdictional determination requests for comparable water-adjacent industrial sites in the region have taken a median of 14 months to resolve per publicly available Corps case data.Medium
Timeline
2026-05-22Evidence Added

Evidence Imported

U.S. Army Corps of Engineers (Los Angeles District) permitting timeline has been estimated based on comparable