Existing hydroelectric power contracts in the region price at roughly $0.045/kWh, mater…

Existing hydroelectric power contracts in the region price at roughly $0.045/kWh, materially below the U.S. Southwest industrial rate assumed for the Imperial Valley candidate.

Verified
Original Observation

No upstream observation on record — this evidence predates the Observation Bus, or was entered directly by an analyst.

Extracted Claim

Existing hydroelectric power contracts in the region price at roughly $0.045/kWh, materially below the U.S. Southwest industrial rate assumed for the Imperial Valley candidate.

Supporting Sources
Regional infrastructure data
infrastructuresiting
Confidence
MediumReviewed by Project Lead · Accepted 2026-03-17
Linked Entities
Linked Risks

No probabilistic risks linked.

Linked Constraints
Cell Maker B anode capacity constraintMedium
Affected Scenarios

No scenarios reference this evidence.

Affected Decisions
Related Evidence
IDNotesConfidence
EV-026Ontario site qualifies for the Canadian Critical Minerals Infrastructure Fund, which could offset up to 30% of eligible capital costs pending formal application.Medium
Timeline